J.F. Allen Company installs over 12 miles of waterlines for the Adrian Public Service District(Contract #2). The project consisted of diameters of 8″, 6″, 4″ and 2″ line. In addition, there were 72 meter settings, a 50 gallon per minute booster station, two pressure reducing stations, steel casings, water valves, fire hydrants and other related infrastructure necessary to construct a complete functional water distribution system.